Container Homes in the Canary Islands | A New Build Model

//Lokomotive

Project Details

Turning a regulatory constraint into a scalable construction system — shipping container frames as the new load-bearing structure.
01. -

EcoHomes in Islas Canarias

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas in pulvinar

In the Canary Islands, a growing housing bubble and strict planning rules on rustic land pushed me to develop a completely new approach. On agricultural plots, only mobile or prefabricated structures raised at least 40 cm above ground are allowed. Rather than working around this limitation, I made it the foundation of the entire system. The result is a construction method that uses only the steel skeleton of decommissioned shipping containers as a modular load-bearing structure — replacing concrete and conventional steel framing — while removing all the original corrugated walls and rebuilding the envelope from scratch with insulated drywalls, high-performance windows and traditional finishes. The outcome is a real home, not a container.

Two product lines were developed: elevated mobile units for rustic land (compliant with local regulations, 40 m², turnkey from €38,000, delivered in 10–11 weeks); and fully habitable residential units, where the container floor is removed and a new screed is poured directly on the foundation slab, gaining the centimetres needed to meet minimum ceiling height requirements. The same system was then scaled up to full residential masterplans: a 5,000 m² urban plot in Buzanada (Arona, Tenerife), with configurations of 12 to 34 homes (44–120 m²), private gardens, construction costs from €896/m², and projected net margins up to €4M — in a market where new single-family homes with outdoor space simply do not exist.

  • Date26.03.2023
  • ClientPrivat Investor
  • SkillsReal Estate Development, Construction Management, Architectural Design, Business Planning, CAD
  • LocationTenerife, Canary Islands, ES
Quote

A product that addresses a real gap in the local market: new homes with private gardens at construction costs well below traditional building methods, built on a structural system no one else was using.

The Construction System Label: Construction System
The steel frame of decommissioned shipping containers replaces conventional concrete or steel framing. Original corrugated walls are fully removed; new assemblies are built with rock wool insulation (100 mm, class A1), standard or moisture-resistant plasterboard, PVC double-glazed windows (5-chamber profile, Uf ≤ 1.2 W/m²K), sandwich panel roof with bituminous waterproofing. The result is a fully habitable, thermally and acoustically performing home — with zero industrial aesthetic.
Rustic Land Unit Label: 40 m² Mobile Unit
Designed for agricultural plots under Canary Islands regulations. The module sits 40 cm above ground on raised supports, classifying it as a mobile structure. Layout: open-plan living/kitchen, 1–2 bedrooms, full bathroom, optional deck and pool. Fully prefabricated off-site. Turnkey delivery: 10–11 weeks from order. Price: €38,000 all-inclusive — potentially lower with optimised container sourcing.
Residential Village Label: Buzanada Masterplan
A 5,000 m² urban plot in Buzanada (Arona, Tenerife) developed into a residential village of 12 to 34 homes (44–120 m²), all with private gardens. Two layout configurations studied: single-storey and two-storey. Construction costs from €896/m² to €1,120/m² including land, earthworks and utilities. Projected net margins: €1.6M (conservative) to €4M (optimistic scenario), in a market with virtually no competing supply of new single-family homes.
View Project