Construction Feasibility Checklist: Are Your Numbers Built for Today’s Alberta Market?

The question is not whether Alberta is growing. It is whether your project’s numbers were built for the market that exists now, not the one from 18 months ago. Since 2024, construction costs have risen, tariffs have affected metals, interest rates have moved, population growth has slowed and absorption has changed by segment. A feasibility study prepared before those changes may still look convincing on paper while no longer reflecting reality.

This article provides a practical checklist to test whether a construction or development feasibility study is ready for today’s Alberta market, with the questions owners, lenders and project managers should ask before approving a project.

Why feasibility, not technology, is the weak point

Much of the industry conversation focuses on digital tools: BIM, project platforms, drones and AI. These tools help. But projects rarely fail because of missing technology. They fail because the assumptions behind them were never tested against real costs, real absorption and real timelines. KPMG’s Global Construction Survey found that only 31% of projects came within 10% of their budget, and many of the causes it identified originate before construction begins.

The checklist

1. Market and demand

  • Are prices or rents based on current data for the same product type and submarket?
  • Is absorption based on recent months of supply and days on market, not on 2023 or 2024 conditions?
  • Have competing projects under construction and recently completed been identified?
  • Is the target buyer or tenant defined, with incomes that support the assumed price or rent?

2. Site and existing conditions

  • Has the site been surveyed, including topography, services and access?
  • For existing buildings, are as-built drawings verified on site rather than taken from old plans?
  • Are geotechnical and environmental conditions known or at least investigated?

3. Design and buildability

  • Has the design been reviewed for constructability by someone with site experience?
  • Are CAD drawings approved only after field conditions have been verified?
  • Is the scope written down, with inclusions, exclusions and open decisions?

4. Zoning and approvals

  • Does current zoning allow the proposed use and density? In Calgary, has the 2026 repeal of citywide rezoning been considered?
  • Are development charges, levies and permit fees included?
  • Is the approval timeline realistic for the municipality?

5. Construction cost

  • Are unit costs current for Alberta? Altus Group reports overall cost increases of 4% or more in Calgary and Edmonton for 2026.
  • Is escalation included to the expected procurement date?
  • Are tariff-exposed items, such as steel, aluminum and mechanical and electrical equipment, identified and priced with care?
  • Is contingency linked to identified risks rather than a round percentage?

6. Schedule

  • Does the programme include design, permits, procurement and construction?
  • Are long-lead items identified, and are key trades available when needed?
  • Is the schedule consistent with labour conditions? BuildForce Canada projects that Alberta must add 48,800 construction workers by 2035.

7. Financing

  • Are interest rates and lender requirements current?
  • Are presale or pre-leasing thresholds realistic for the segment?
  • Are interest during construction and holding costs calculated on the realistic schedule?

8. Sensitivity and scenarios

  • Has the project been tested with higher costs, lower revenue and slower absorption?
  • Are the breaking points known: how much can costs rise before the project fails?
  • Is there a plan for each downside scenario?

9. Governance

  • Who validated the numbers before the project was approved?
  • Is there a decision log and a risk register with owners?
  • Are change control and design freeze procedures defined?

Who validated the numbers?

Of all the questions above, one matters most: who validated the numbers before approval? A feasibility study prepared by the same person who wants the project to proceed carries an obvious optimism bias. An independent review, even a short one, catches assumptions that are outdated, missing or simply too hopeful. Optimism belongs in the vision, not in the spreadsheet.

Signs a feasibility study needs updating

  • It is more than 12 months old.
  • Costs were estimated before 2025 or without escalation.
  • Absorption assumptions come from the boom years.
  • It contains only one scenario.
  • Site information was assumed rather than surveyed.

If two or more apply, refresh the study before committing further funds.

How long a proper review takes

An independent review of an existing feasibility study does not need to take months. For a typical residential or small commercial project, a focused review of market inputs, cost plan, schedule, financing and sensitivity can usually be completed in a few weeks, provided the basic site information exists. If surveys or market studies are missing, those gaps become the first actions. The time invested is small compared with the duration and cost of the project it protects.

Using the checklist in practice

The checklist works best as a conversation, not a form. Go through it with the developer, designer, cost consultant and project manager in one meeting. For each item, mark it as confirmed, assumed or unknown. Items marked assumed or unknown become actions with owners and dates. By the end of the meeting, everyone knows where the study is solid and where it relies on hope, and the owner can decide whether to proceed, pause or reshape with full information.

The bottom line

Alberta is growing, but growth does not protect a project whose feasibility was built on 2023 assumptions, pre-tariff costs and absorption rates that no longer exist. Use the checklist, update the numbers and make sure someone independent has validated them before the shovel goes in.

If you are structuring a project in Alberta and want a second set of eyes on the pre-construction logic, see my feasibility and project management services, read about cost scenarios in feasibility, or contact me.

Frequently asked questions

What should a construction feasibility study include?

Market and demand analysis, site information, design and buildability review, zoning and approvals, cost plan, schedule, financing, sensitivity analysis and governance.

How often should a feasibility study be updated?

Whenever market conditions change significantly, and at least before major commitments such as land closing, design contracts, permits or construction financing.

Why get an independent feasibility review?

Because the people promoting a project naturally lean towards optimistic assumptions. An independent review tests them objectively.

Sources

  • 140 views
  • 1 Comment
1 thought on “Construction Feasibility Checklist: Are Your Numbers Built for Today’s Alberta Market?”
  • eros belotti Project Manager
    eros

    The shift happening in Alberta right now isn’t about market weakness — it’s about market selectivity.
    CMHC’s Housing Market Outlook signals it clearly: starts remain high, but absorption is moderating and developer caution is growing. That combination doesn’t punish good projects. It exposes the ones that were approved on optimistic assumptions.
    The pattern I see most often in pre-construction reviews:
    → Cost estimates anchored to 2022–2023 tender prices

    → Absorption timelines that don’t account for current presale conditions

    → CAD documentation that was never cross-checked against actual site conditions
    None of these are technology problems. They’re sequencing problems — decisions made before the right data was in the room.
    If you’re working on a project in Alberta and want to pressure-test the pre-construction logic before it becomes a site problem, that’s exactly what I do.

Leave a Reply

Your email address will not be published. Required fields are marked *

Eros Belotti 01.

Eros Belotti, construction project manager
Eros belotti

Construction project manager with over 20 years of experience in Europe and the Canary Islands. Specialized in modular housing, container construction, real estate development and international project management. Founder of Reforma Vivienda Tenerife and Donkey Lab.

Calendar

November 2026
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
30  
© Eros Belotti 2026 / All rights reserved.
Get in Touch
Close