Canada’s Housing Execution Gap: Why Job Sites Slow Down Delivery
Canada needs far more homes than it is building. In June 2025, CMHC estimated that the country would need up to 4.8 million additional homes over the next decade, roughly 430,000 to 480,000 starts a year, to restore affordability to pre-pandemic levels. In 2025 Canada started 259,028 homes, and CMHC’s 2026 outlook expects starts to..
Read more- 190 views
- 0 Comment
When to Stop a Construction Project Before It Starts
The budget was approved. The site was available. The client was ready to start. I still recommended not to proceed. In my assessment I added one line to the project risk register: Condition: project scope unclear Probability: confirmed Impact: high Owner: developer and project manager Status: invisible to the team Next step: do not proceed..
Read more- 204 views
- 0 Comment
Alberta Construction Market 2026: Why Pre-Construction Discipline Wins
Alberta housing starts are cooling from their 2025 record. ATB Financial expects about 45,000 starts in 2026, down from 54,858, and builder confidence across Canada has fallen. Many people read that as a weak market. I don’t. I added a new line to the risk register I use to assess projects in 2026: Condition: Alberta..
Read more- 206 views
- 1 Comment
The Drawing Was Perfect: Why the Design-to-Site Handoff Fails
In the meeting room, the project was solid. Clear drawings, approved plans, everyone aligned. Three weeks into construction, trades were working from different drawing versions, requests for information were piling up and the project manager was firefighting instead of managing. The drawings had not changed. The execution had. This gap between design completion and site..
Read more- 172 views
- 1 Comment
As-Built Surveys for Renovations: Why Budgets Fail Without Accurate Site Data
Renovations and commercial fit-outs have a reputation for going over budget and over schedule. The usual suspects are hidden damage, slow trades and indecisive clients. But in most projects I have reviewed, the real cause was decided before the first tool was picked up: the design and the budget were based on information about the..
Read more- 245 views
- 0 Comment
Estadio de Gran Canaria Renovation: Why Technical Specifications Decide Major Tenders
The renovation of the Estadio de Gran Canaria, home of UD Las Palmas and one of Spain’s candidate venues for the 2030 FIFA World Cup, has become a case study in how large public construction contracts succeed or stall. In less than six months the project went from a €174.7 million tender with no bidders,..
Read more- 223 views
- 1 Comment
Building Permit Delays in Alberta: Why Incomplete Applications Cost Months
Waiting for a building permit is one of the most frustrating parts of any construction project. Owners blame the municipality, contractors blame the designers and everyone loses weeks. But a large share of permit delays have nothing to do with how fast the city works. They come from applications that are not complete when they..
Read more- 206 views
- 0 Comment
Construction Project Governance: Why Coordination Beats Funding in Alberta
Alberta has one of the largest construction pipelines in Canada. Industry estimates put the province’s inventory of major capital projects in the hundreds of billions of dollars, and construction employment in Alberta grew faster than in any other province in early 2026. Yet the biggest risk to that pipeline is not money, and it is..
Read more- 175 views
- 0 Comment
Renovation Budget Overruns: Why They Happen at Rough-In
On signing day, every renovation looks on budget. The quote is clear, the schedule fits and everyone is optimistic. Then the project reaches rough-in, the stage when plumbing, electrical and mechanical services are installed inside open walls, and the numbers start to move. A fixture is relocated, a wall shifts a few centimetres, a vanity..
Read more- 265 views
- 0 Comment
Alberta’s Construction Pipeline Is Funded. Who Will Build It?
Alberta has one of the largest construction pipelines in Canada. ICBA’s Winter 2026 Construction Monitor estimates major projects at about $166 billion, with roughly $71 billion under construction, and other industry estimates of proposed and planned projects are higher still. The capital is largely committed. The crews are not. Most feasibility studies model land, costs,..
Read more- 291 views
- 0 Comment