Loading
Share This
Get in Touch
Scroll Down
//Alberta

Alberta Construction Cash Flow: What Q2 2026 Insolvency Data Shows

Alberta Construction Cash Flow: What the Q2 2026 Insolvency Data Actually Says Alberta is the fastest-growing economy in Canada. It also just posted a 35.6% year-over-year jump in business insolvencies. Both statements are true, and the gap between them is where the Alberta construction cash flow story lives. Nationally, business insolvencies were essentially flat last..

Read more
  • 141 views
  • 1 Comment

Alberta Construction Costs 2026: Where Tariffs Actually Hit

Supplies up 20%. Project costs up 4%. Same year, same market. Someone is absorbing the difference — and on most projects, it isn’t the client. Alberta construction costs rose across the board in 2026, but the headline numbers hide the part that actually matters to anyone pricing work: the increase did not spread evenly. It..

Read more
  • 185 views
  • 1 Comment

Alberta Building Code 2025: What Part 10 Means for Retrofits

Maintenance is exempt. Replacement isn’t. That distinction sits inside the 2025 National Building Code, and it is the single most consequential provision the Alberta building code is likely to inherit once the province completes its review. If it is adopted as drafted, it will change how retrofit work in this province is scoped, priced and..

Read more
  • 114 views
  • 1 Comment

Alberta Construction Market 2026: -21% Rotation Explained

Alberta’s Construction Market Is Rotating, Not Slowing: What the 2026 Data Actually Says Minus 21% residential. Plus 6% non-residential. Same province, same decade, opposite directions. Both numbers are real, both come from credible sources, and almost every conversation about the Alberta construction market 2026 quotes only the first one. That omission is expensive, because the..

Read more
  • 119 views
  • 1 Comment

Alberta Housing Accelerator Fund: 70,000 Homes Approved

The Alberta Housing Accelerator Fund story is usually told in two headlines — one for Calgary, one for Edmonton. That framing misses the point. In under two years, the federal Housing Accelerator Fund (HAF) helped fast-track close to 30,000 residential building permits — roughly 70,000 homes — across Alberta’s largest cities, and the ripple reached..

Read more
  • 121 views
  • 1 Comment

Alberta Non-Residential Construction: The 2026 Shift to Watch

Alberta non-residential construction is quietly becoming the most important story in the province’s building sector — and it’s the one most people are still missing. While headlines fixate on housing, the data shows the money changing lanes: residential investment is set to peak in 2026, while non-residential activity keeps climbing through 2035. For any company weighing..

Read more
  • 152 views
  • 1 Comment

Alberta Housing Infrastructure: Why $510M in Pipes Matters More Than Permit Reform

Alberta housing infrastructure just received the clearest signal in years about where the province will actually be able to build. On July 29, 2026, Canada and Alberta signed a new infrastructure agreement worth up to $510 million in federal funding, with the province contributing as much as $428 million on top of it, over eight..

Read more
  • 119 views
  • 1 Comment

The Alberta Construction Market in 2026: Housing Is Down, But the Industry Is Booming

The Alberta construction market 2026 story that most headlines are telling is simple: things are slowing down. Housing starts are falling, buyers are cautious, and the residential engine that powered the province for years is cooling. That story is true — and it is also pointing you at the wrong market. Because while houses slow, another side..

Read more
  • 118 views
  • 1 Comment

Alberta Construction Labour Shortage: 48,800 Workers Needed by 2035

Alberta’s construction market is sending two signals that look contradictory. Housing starts are down 5% year-over-year. Non-residential activity is forecast to climb through 2035. Both are true — and the Alberta construction labour shortage is what connects them. The forecast from BuildForce Canada is blunt: the province needs to add 48,800 construction workers by 2035, while 43,700..

Read more
  • 210 views
  • 1 Comment

Calgary vs Canmore Real Estate: Two Alberta Markets Moving in Opposite Directions (2025)

Look at Calgary vs Canmore real estate side by side and you would assume you are reading one story: two Alberta markets, one hour apart, both riding the same provincial economy. You are not. In 2025 they moved in opposite directions — Calgary’s benchmark price fell while Canmore’s detached homes climbed almost 10%. The numbers below show..

Read more
  • 98 views
  • 0 Comment

Eros Belotti 01.

Eros Belotti, construction project manager
Eros belotti

Construction project manager with over 20 years of experience in Europe and the Canary Islands. Specialized in modular housing, container construction, real estate development and international project management. Founder of Reforma Vivienda Tenerife and Donkey Lab.

Calendar

October 2026
M T W T F S S
 1234
567891011
12131415161718
19202122232425
262728293031  
© Eros Belotti 2026 / All rights reserved.
Get in Touch
Close